Schmetz Needle Factory
Client:
Design Team:
Project Year: 2008
Location:
Area: .
Estimated Cost: INR
Consultants:
Contractor:
The requirement for a shop-floor and admin block was dealt with in a way that the landscape was brought into/ between the two creating interesting links / entrances for the shop-floor workers and admin staff. The contoured nature of the site was used by creating a lower ground entrance for the staff / social block at the northern end. The higher natural ground level matches the shop-floor level i.e. ground floor level at the southern end.